Brighton Waste House
…building can be constructed almost entirely by young people studying construction trades, architecture & design. To this end over 300 students worked on the project, which was initially fabricated in the workshops of City College Brighton and Hove, and then assembled and completed by students and apprentices between May 2013 and April 2014. While being constructed, over 750 school pupils from over 35 local primary, secondary and tertiary colleges…